Built for building and planning departments

Every application checked against your code.
Every review clock in view.

Permitting and Inspections takes applications from residents and contractors online and checks each one against the checklists and code sections your jurisdiction has adopted before it enters review. Complete applications are routed to building, planning, fire, and engineering at once, comments come back on one record, and inspections are scheduled and resulted from the field. Every approval is signed by a named reviewer, and the statutory review clock is shown on every application.

  • Online applications
  • Completeness checked on intake
  • Multi-department plan review
  • Inspections resulted from the field
Plan review queueCITY OF RIVERTONSample
186 applications in review · 14 within 5 days of the review deadline · 3 awaiting resubmittal
Application · Project · ClockStatus
  • BLD-2027-01142New single family, 2,860 sq ft · Day 24 of 30Fire comments due
  • BLD-2027-01177Deck addition, 320 sq ft · Day 6 of 10Building review
  • COM-2027-00218Tenant improvement, retail · PausedAwaiting resubmittal
  • ELE-2027-02304Residential solar, 8.4 kW · Day 2 of 10Complete
  • BLD-2027-01190Accessory dwelling unit · Not startedIncomplete
Review periods configured from your adopted ordinance and the timelines your state sets
ISO 42001ISO 27001SOC 2 Type IICJIS Security AddendumHIPAA CompliantGDPR CompliantNIST 800-53 Moderate

What it changes for your office

Most permit delays start before review begins.

An application that arrives without a site plan, a stamped drawing, or the right fee does not get reviewed. It gets returned, often after it has waited in line for days. Permitting and Inspections checks each application against your own requirements the moment it is submitted, so the reviewers start with complete files and the applicant learns what is missing while it is still easy to fix.

For the building official

You see every application by stage, by reviewer, and by how many days remain on its review clock. Applications that are close to their deadline are raised before the deadline passes, and every approval, condition, and denial is signed by the reviewer who made it and tied to the code section it relied on.

For plan reviewers and inspectors

Reviewers receive complete applications with the checklist already worked, the code sections that apply, and the comments from other departments on the same record. Inspectors see their route for the day on a tablet, record results and corrections on site, and attach photos that stay with the permit.

For residents and contractors

Applicants apply online, learn on submission what is missing, pay fees in the same place, and request inspections without calling the counter. They can see where the application stands, which department has it, and what the city needs from them next.

Permit applicationApplicant portalSample
  1. 1. Project
  2. 2. Documents
  3. 3. Completeness check
  4. 4. Fees
  5. 5. Submit

Apply for a residential building permit

Project

Accessory dwelling unit, 640 sq ft, 92 Larkspur Ave

Site plan

Received, setbacks shown

Structural drawings

Not stamped by a licensed engineer

Required by Checklist R-4, item 6.

Energy compliance form

Missing

Required for new conditioned space under your adopted energy code.

Zoning

R-1, ADU permitted under Municipal Code 17.24.040
Fix and resubmit

The product

Autessa Permitting and Inspections, what your team works in.

Completeness Review

Your submittal checklists and the code sections behind them are encoded once. Each application is checked against the checklist for its permit type, and every item is marked as met, missing, or needing a reviewer's judgment. The applicant receives a written list of what is missing. Staff confirm the determination before the application is accepted or returned, and the review clock starts only on acceptance.

Completeness reviewBLD-2027-01190Sample

Accessory dwelling unit

92 Larkspur Ave · Parcel 07-14-226-011 · Zoned R-1

Incomplete
Checklist
R-4 Residential new construction
Items met
11 of 14
Fees estimated
$2,318.40
Review clock
Not started

Findings

  • Missing. Structural drawings are not stamped. Checklist R-4, item 6.
  • Missing. Energy compliance form for new conditioned space.
  • Needs a reviewer. Rear setback measures 4 ft 10 in against a 5 ft minimum under Municipal Code 17.24.040(C).
Return to applicantAccept with notes

Plan Review Routing

Accepted applications are routed to every department whose review the permit type requires, at the same time rather than one after another. Each reviewer comments against a code section, comments are combined into one letter for the applicant, and resubmittals return to the reviewers who raised the issues. The review clock pauses and resumes according to the rules your jurisdiction follows.

Review routingBLD-2027-01142Sample

New single family, 2,860 sq ft

Cycle 1Cycle 2Cycle 3
BuildingP. Nakamura4 commentsApproved
PlanningG. FerraroApproved
FireL. Achebe1 commentIn review
EngineeringH. Sorensen2 commentsApproved
ApprovedComments issuedIn review

Inspections

Applicants request inspections online for the next available day. Inspectors receive a route grouped by area, and on site they record pass, partial, or fail against the inspection type, with the code section for each correction and photos attached. A failed item creates a reinspection request, and the next inspection on the permit cannot be scheduled until the prior one has passed.

Inspection resultBLD-2027-00866 · FramingSample

Inspector on site · Result reviewed before it is posted

Framing inspection at 15 Wren Street. Header over the garage door is undersized and there is no fire blocking at the soffit. Everything else passes.
Recorded as a partial pass with two corrections. The header correction references the span table in your adopted residential code, and the fire blocking correction references the concealed space provision. Do you want to attach the two photos you took?Source: Adopted residential code, framing and fire blocking sections; Riverton amendments 15.04
Yes, attach both and post it.

Result posted by R. Okonkwo, Inspector. Reinspection request sent to the contractor.

Clocks and Workload

Every application shows where it sits against the review period your ordinance and your state's rules set, and the department view shows which reviewers are carrying the applications closest to their deadlines. The building official can reassign work before a clock runs out, and the monthly report shows how many applications were completed within their review period and how many inspections were performed within a day of the request.

Department dashboardBuilding and PlanningSample

Month to date

412

Applications received

97

Returned as incomplete on intake

Returned the day they were submitted

96%

Reviews completed within the review period

91%

Inspections within one business day

Applications near their review deadline, by department

  • Building6
  • Fire4
  • Engineering2
  • Planning2

In practice

The details that decide whether a permit decision holds up.

Three of them, handled the way a careful building department already handles them: which code applies, who makes the call, and when the clock runs.

On the code

Your adopted code is the only standard it applies

Completeness checks and review comments rely on the code editions, local amendments, and checklists your jurisdiction has adopted. Every finding names the section it relies on, and when your council adopts a new edition, applications submitted under the prior edition continue to be reviewed against it.

On decisions

A reviewer signs every approval and every denial

The system checks, drafts, and routes. It does not approve a permit, waive a requirement, or issue a certificate of occupancy. Each of those is done by a named reviewer, inspector, or official, and the record shows who it was and what they relied on.

On the review clock

The clock follows your rules, not the inbox

The review period starts when an application is accepted as complete, pauses when comments go back to the applicant, and resumes on resubmittal, according to the timelines your ordinance and your state set. Each pause and resume is recorded with its reason, so the elapsed time can be shown day by day.

Below: the record a building official reviews before signing a certificate of occupancy.

Certificate of occupancyBLD-2026-03317Sample

15 Wren Street

New single family · Parcel 07-09-114-022

Ready for signature
Inspections
14 of 14 passed
Final, building
Passed Apr 28 · R. Okonkwo
Final, fire
Passed Apr 29 · L. Achebe
Fees
Paid in full
Conditions of approval
3 of 3 satisfied
Occupancy
R-3

Checked before signature

  • Open corrections. None. The two framing corrections were cleared on reinspection Mar 12.
  • Other departments. Engineering accepted the as-built grading certificate on Apr 22.
  • Holds. No code enforcement case or stop work order on the parcel.
Sign certificateReturn with note

Defensibility

When a permit decision is challenged, the record already answers it.

Permit decisions are questioned from every side. An applicant asks why the city took so long. A neighbor asks why a variance was not required. An appeals board asks which code section a denial relied on. The answers depend on what the department can show about when each step happened and who decided it.

Permitting and Inspections keeps that record as the work happens. Every completeness finding records the checklist item and code section. Every review comment records the reviewer and the section it cites. Every pause in the review clock records its reason. Every inspection result records the inspector, the photos, and the corrections. The log is append-only, so the record you produce for an appeal is the record that was made at the time.

One application, from submission to issued permit, with every clock event shown.

Decision trailBLD-2027-01142Sample

2810 Copperline Road · New single family

  1. Mar 2, 2027 11:20 · Permitting and Inspections

    Completeness check passed, 14 of 14 items met

    Basis: Checklist R-4, rev. 2026

  2. Mar 3, 2027 09:05 · M. Castellanos, Permit Technician

    Accepted application and started the 30 day review clock

  3. Mar 16, 2027 15:48 · Permitting and Inspections

    Issued combined comment letter from four departments and paused the clock at day 13

    Basis: Clock pauses on comments under your review ordinance

  4. Apr 1, 2027 10:12 · Applicant portal

    Resubmittal received and the clock resumed at day 13

  5. Apr 12, 2027 14:30 · L. Achebe, Fire Plans Examiner

    Approved fire review

    Basis: Adopted fire code, access and hydrant spacing sections

  6. Apr 13, 2027 09:00 · P. Nakamura, Building Official

    Issued permit at day 24 of 30

The same record across a quarter, ready for the council and the annual report.

Quarterly permit reportQ1 2027Sample
1,186 permits issued · 4,310 inspections performed
Permit type · Issued · Median days · Review periodStatus
  • Residential new construction84 · 22 · 30 daysOn time
  • Residential alteration402 · 7 · 10 daysOn time
  • Commercial tenant improvement61 · 27 · 30 daysOn time
  • Commercial new construction9 · 41 · 45 days1 late
  • Electrical, mechanical, plumbing630 · 2 · 5 daysOn time
Median days counts only days the review clock was running

See it check your own applications.

Bring your submittal checklists, your adopted code and local amendments, and a handful of recent applications. We will show your permit technicians and reviewers how each application would have been checked on intake, routed for review, and tracked against its review clock.

Contact us

FAQ

Questions we are glad to answer.

Does it approve permits on its own?+

No. The system checks completeness, drafts comments, and routes work. Every approval, denial, condition, inspection result, and certificate of occupancy is signed by a named reviewer, inspector, or official.

Which code does it check against?+

The code editions, local amendments, and submittal checklists your jurisdiction has adopted. Every finding names the section it relied on, and applications stay under the edition in effect when they were submitted.

How does it handle review deadlines?+

We configure the review periods from your ordinance and your state's rules for each permit type, including when the clock starts, pauses, and resumes. Each application shows its elapsed days, and the building official sees which applications are close to their deadline.

Can inspectors use it in the field?+

Yes. Inspectors see their route on a tablet or phone, record results and corrections against code sections, attach photos, and post results from the site. Applicants and contractors are notified of results and reinspection requests right away.

Where does our data go?+

Permitting and Inspections runs in your own Autessa Private Cloud, an environment your jurisdiction controls, with keys your jurisdiction holds. Applications, plans, and inspection records are not used to train models for anyone else.